Dalhousie

With exciting new retail, residential and office space, green design initiatives and improved community amenities, the proposed site redevelopment will deliver something fresh to the community.

The Plan

Our Dalhousie Co-op is to undergoing a redevelopment worthy of the high profile location. The proposed 632,325 square-foot redevelopment will include a relocated 47,000 square-foot grocery store, new gas bar and car wash as well as a new 5,200 square-foot Wine Spirits and Beer store, 58,000 square feet of new office space, 39,500 square feet of new retail space and 436 new residential units. When completed, it will provide more than 300 jobs and homes for 800 people.

Exciting new features

The Dalhousie location will refresh the community with sharp design and new features: 

  • An updated, attractive new Co-op store similar to recent designs at Midtown and Crowfoot (the Co-op store and other services, with the exception of the car wash, will remain open until the new services are completed).
  • New and enhanced Co-op services and product offerings.
  • Community focused residential, office and retail amenities.
  • Relocated gas station with convenience store and liquor store.
  • Green rooftop space.
  • Meeting space(s) for the community.
  • Environmentally sustainable mechanical & electricial systems.
  • Safer connection to area pathways.

Project specifics

The specifics of the Dalhousie redevelopment approved by the City of Calgary council:

  • 436 residential units (1-3 bedroom suites)
  • 749 parking stalls
  • A new Co-op food centre and multi-residential units from the 2nd to 22nd floors.
  • A Professional building (4 floors)
  • A mixed use residential building (10 floors)
  • A bank  (1 floor)
  • A new Wine Spirits and Beer location (1 floor)

Timeline

We will minimize disruption in the community by keeping all services open during construction. The Dalhousie development will be developed in a staged approach. Proposed opening date for Phase 1 is undetermined at this time. It should take approximately 6 years to complete all 5 phases of the project.